← WorkConcept work

Northline

Pre-flight briefings, reimagined forthe flight deck.

Client
Self-initiated concept
Industry
Aviation
Services
Mobile App Design, Offline-first Engineering, Prototyping
Year
2025

Concept project. Created by FIGORA to demonstrate our approach — not a client engagement. Artwork is illustrative.

01

Project overview

Northline imagines how a regional airline's crew could prepare for a flight using one calm, prioritised tablet experience instead of a stack of PDFs and printouts.

02

Business challenge

Crews receive critical information from many systems in many formats, often minutes before departure and sometimes without connectivity. Clarity, speed and reliability are safety concerns, not niceties.

03

Project objectives

  1. 01

    Surface what changed since the last briefing

  2. 02

    Work fully offline once synced

  3. 03

    Support quick glances in low light

  4. 04

    Respect existing operational procedures

04

Research and discovery

Desk research into published aviation human-factors guidance, a review of electronic flight bag patterns, and scenario mapping for turnarounds, delays and diversions.

  • Human-factors review
  • Scenario mapping
  • Information hierarchy workshops
  • Prototype walkthrough script

05

Strategy

Prioritise by consequence. Information is ranked by operational impact and highlighted by what has changed, so the crew's attention goes where it matters.

06

Design process

  1. 01

    Change-first briefing

    A 'since last sync' layer highlights new or amended items.

  2. 02

    Night mode by design

    A dedicated dark palette and type scale built for dim cockpits.

  3. 03

    Offline-first architecture

    Local data store with background sync and clear freshness indicators.

07

Final solution

A cross-platform tablet app concept with a prioritised briefing feed, shared crew notes and offline sync, prototyped for walkthroughs with domain experts.

  • Consequence-ranked briefing feedFeature 01
  • Change highlightingFeature 02
  • Offline sync with freshness statesFeature 03
  • Crew notes and sign-offFeature 04

08

Outcomes and measurable impact

Because this is a concept project, we don’t report results. Instead, here is how success would be measured if it were taken to market — the same measurement framework we agree with clients before work begins.

Success measureHow we would measure it
Time to complete a briefingTimed scenario walkthroughs
Critical-item recallPost-briefing comprehension checks
Sync reliabilityOffline/online transition testing

Have a challengelike this?

Let’s talk about how we’d approach it for your business.